Call us now on 01206 322899

Bristol Water, Clevedon TW

 Background - New installation of salt saturator tank and surrounding concrete bund.

The Problem -
Following the installation at Clevedon Treatment Works,they needed a safe, slip-resistant and corrosion-free access platform to allow personnel to monitor instruments on top of the tank.

The Solution - Working closely with their project engineers and using our GRP knowledge we designed, fabricated and installed a bespoke access stair/platform on time and within budget.